One of the key post-event activities in the 15th IIGW 2026 is a geothermal field trip to PT. Geo Dipa Energi (Persero) Unit Patuha. This program is designed to provide participants with both theoretical understanding and direct field exposure to geothermal energy systems, operations, and infrastructure. Scheduled for Thursday, July 16th, 2026, this field trip offers a unique opportunity to explore one of Indonesia’s most iconic geothermal sites, known for its operational excellence and historical significance in the development of geothermal energy in the region.
Participants will visit key locations such as geothermal wells, the power generation facility, and Kampung Direct Use. They will engage directly with experts, observe operational procedures, and gain insights into the real-world application of geothermal technologies.
OBJECTIVES
- To educate participants on geothermal field systems and direct-use facilities.
- To provide an overview of geothermal power plant operations and supporting infrastructure.
- To offer participants an opportunity to learn directly from field professionals and site engineers.
- To encourage cross-sector dialogue and knowledge sharing between students, academics, professionals, and industry representatives.
- To showcase geothermal contributions to local development and sustainability.
EXPECTED OUTCOMES
- At the end of the field trip, participants are expected to:
- Demonstrate an improved understanding of geothermal systems and plant operations.
- Identify the main components of geothermal infrastructure, including wells, turbines, and control systems.
TARGETED PARTICIPANTS
This field trip is limited to a maximum of 30 participants and is intended for professionals and students who are involved in geothermal development, research, and operations. Targeted participants include:
- Geothermal professionals and engineers
- Academic researchers and faculty members
- University students
Price
Local Participants
- Local Company: IDR 1,700,000
- Local Univ./Gov./Public: IDR 1,000,000
- Local Student: IDR 500,000
Overseas Participants
- Overseas Company: USD 110
- Overseas Univ./Gov./Public: USD 60
- Overseas Student: USD 30
Limited to 15 participants only
Rundown Field Trip:
Title: Field Trip to Patuha
Venue: PT Geo Dipa Energi (Persero) Unit Patuha
Date: July 16th, 2026
| No | Time | Location | Activities | PIC / In Charge |
| 1 | 05.30 - 06.00 | ITB - Ganesha | Gathering, attendance, and final briefing | Committee |
| 2 | 06.00 - 08.00 | On the road | Heading to PLTP Patuha (via Soroja Toll Road) | Committee |
| 3 | 08.00 - 08.30 | Geo Dipa Office | Arrival, registration, & Safety Induction (H2S Protocol) | HSE Officer |
| 4 | 08.30 - 09.30 | Meeting Room | Technical Presentation (Reservoir, Operations, & Direct Use) | Geo Dipa Engineer |
| 5 | 09.30 - 10.45 | Wellpad Area | Site Visit Part 1: Observation of Wellhead, Gathering System, & Silencer | Geo Dipa Engineer |
| 6 | 10.45 - 12.00 | Power Plant Area | Site Visit Part 2: Plant Tour (Turbine, Cooling Tower, Control Room/DCS) | Geo Dipa Engineer |
| 7 | 12.00 - 13.00 | Office / Canteen | Break (Rest, Pray, Lunch) | Committee |
| 8 | 13.00 - 13.15 | On the road | Transit to Kampung KaDieu (Sugihmukti Village) | Committee |
| 9 | 13.15 - 14.15 | Kampung KaDieu | Direct Use Tour: Observation of Food Dehydrator, Greenhouse, & Eco-wellness facilities | CSR / KaDieu Guide |
| 10 | 14.15 - 14.45 | Kampung KaDieu | Q&A Session (technical & socio-economic impact), Wrap-up, & plaque handover | All |
| 11 | 14.45 - 15.00 | Kampung KaDieu | Group photo session & preparation to board the bus/vehicle | Committee |
| 12 | 15.00 - 17.30 | On the road | Return trip to Bandung (anticipating afternoon traffic) | Committee |
| 13 | 17.30 - 18.00 | ITB - Ganesha | Arrival at campus, belongings check, & dismissal | Committee |
For Registration:
Registration:
https://workshop.geothermal.itb.ac.id/2026/registration/
Contact Person:
Rezki (+6285823522117)
Akbar (+6282144880227)
Hussein (+6285161862399)
